Services
Data migration to Engineering Base
Transferring existing data from ELCAD, RUPLAN or PDF into a clean Engineering Base structure.
What's included
Transferring existing documentation into Engineering Base
Drawings from different CAD generations, red-line mark-ups and scans become a reliable as-is status.
Described in detail on the page PTD and substations
Data transfer when starting with Engineering Base
Data transfer from third-party systems such as ELCAD, RUPLAN or PDF, where useful
Described in detail on the page EB as a Service
Retrofit of existing process plants
Transfer of the current state into Engineering Base with uniform designation
Described in detail on the page Process
Supplier contributions in large projects
We transfer supplier contributions that were not created in Engineering Base into the project structure
Described in detail on the page Large projects